Tangent Pile Retention

Tangent pile walls are comprised of drilled-in concrete piles – often installed using the augured cast-in-place method – that are located within very close proximity to each other. These piles may be reinforced with structural steel or reinforcement cages. This retention type may be used when a relatively thin wall is desired with superior strength from the composite nature of the piles.

Dow Agrosciences

Project Location: Indianapolis, IN

Owner: Dow Agrosciences
Completion Year: 2011

  • 60 LF of Tangent Pile Wall
  • 84 ea- Drilled in piles
  • 25 ea –tiebacks

Overview

Beaty was selected by Wilhelm Construction to provide an Earth Retention solution for a proposed building and loading dock expansion. The project consisted of multiple types of design build earth retention applications. Ultimately Beaty Construction designed and installed an anchored and braced h-pile and lagging systems as well as a tangent pile wall.

Highlights

  • 60 LF of Tangent Pile Wall
  • 84 ea- Drilled in piles
  • 25 ea –tiebacks
  • 9,000 SF of lagging installation

JW Marriott Hotel

Project Location: Indianapolis, IN
Owner: White Lodging/Hunt Construction Group
Completion Year: 2008

  • 200 LF of Tangent Pile Wall
  • 250 Driven Piles
  • 55,000 SF of Wood Lagging

Overview

 

To facilitate construction of the new JW Marriott in Indianapolis, a large scale earth retention system was required. The new hotel included 2 levels of below grade parking which required excavation depths of 30’ below existing grade. To maximize square footage of the new structure, below grade foundation walls needed to be constructed as close to existing property lines as possible.

The Bid Documents called for a design-build earth retention system consisting of steel h piles, wood lagging, temporary and permanent tie-backs, and a tangent pile wall. Beaty Construction was successful in being awarded the work.

Upon award, Beaty’s in-house team was able to quickly complete design submittals, mobilize, and install an earth retention system that met the Owner’s budgetary needs and the Construction Manager’s schedule.

Highlights

  • 200 LF of Tangent Pile Wall
  • 250 Driven Piles
  • 55,000 SF of Wood Lagging
  • 400 Temporary Tie-Backs
  • 60 Permanent Tie-Backs